Yard Machines

Yard Machines

PROJECT: Stacker Cable Reelers Replacement

We completed detailed designs and project management for the installation of three (3) new HV cable reelers to replace failing existing units on the site stackers. The installation also included the replacement of the midpoint junction box with power/control separated compartments and “C” connectors for the HV connections.

We were responsible for:

  • Concept design and Capital cost estimates
  • Detailed design drawings
  • Scope of Work Documents for Civil, Mechanical, Electrical, and HV terminations.
  • Project management for the installation
  • Testing and Commissioning

Time Frame: 2020

Approx. Value: $125,000